• دوشنبه 3 مهر 1402
    Monday 25 September 2023

Khoramabad - Zal Bridge

 

 

 

It is a part of the main route of Tehran-Bandar Imam which had been operated at the end of 2010:

-          With length of (approx.) 104 km;

-          Construction cost was (approx.) 7,500 million Rials what deducted in comparison to the similar length in existed road with length of 61 km.

 

Due to the route passage through tough region of Zagros Mountains, it has been executed:

-          Tunnels: 15 sets with the length of 26 km;

-          Special bridges: 15 sets with length of 2,600 m;

-          Excavation: 40 million m2 ;

-          Concrete: One million m2;

-          Asphalt: One million tons of in this Freeway;

  • ...